<--- previous slide
52     1000 truckloads peel
DHJanzen100055.jpg
high resolution

 

next slide --->
So here you see 1000 truckloads of orange peel/pulp just placed in the 3 hectare biodegredation site. Each pile is a maximum of 1.5 m deep (31 January 1998). The piles were then leveled with a tractor by the company, and nature was allowed to run its course.
Image to be compared with this image:

back to lecture slides
or skip to:

slide (1-80)
slide with image: